Client: Pickens County, South Carolina
Status: Awarded 2007; Completed 2009
Cost: $3.5 Million
Pickens County upgraded the existing plant with advanced clarification, a storm surge basin, RAS/WAS pump station, aerobic digester, tertiary disk filtration, UV disinfection, cascade, and new controls and chemical feed.
HMW designed and innovative storm surge control system as part of the influent pump station and converted the existing basin for storm flows.
Wes Hulsey, P.G.
Senior Consultant