Dedicated To Doing the Groundwork.

search icon

   

Liberty-Roper (SC) WWTF Upgrade

Client: Pickens County, South Carolina
Status: Awarded 2007; Completed 2009
Cost: $3.5 Million

General Description

Pickens County upgraded the existing plant with advanced clarification, a storm surge basin, RAS/WAS pump station, aerobic digester, tertiary disk filtration, UV disinfection, cascade, and new controls and chemical feed.

Innovative Concepts

HMW designed and innovative storm surge control system as part of the influent pump station and converted the existing basin for storm flows.

Contact

Wes Hulsey, P.G.
Senior Consultant