Client: Pickens County, South Carolina
Status: Awarded 2007; Completed 2008
Cost: $1.1 Million
Pickens County closed the aging Liberty Cramer WWTF and now conveys sewer flows to the newly upgraded Liberty Roper WWTF Excessive peak flows associated with Inflow/Infiltration during rain events were reduced by the storm surge basin.
HMW lowered project costs by converting an existing treatment basin to a storm surge control basin.
Tom Vollmar, P.E.
Project Manager