Dedicated To Doing the Groundwork.

search icon

   

City of King Goff Road Pump Station

Client: City of King
Status: Ongoing
Cost: $474,000

General Description

The project generally consisted of demolition of the existing sewage lift station, and installation of a new 700 gpm duplex submersible lift station. New pump station work includes installation of a new concrete wetwell & valve vault, pumps, connection to existing 10" force main, electrical, controls, site improvements, and other miscellaneous work.

Innovative Concepts

Unique features of this project included interconnecting the existing wetwell to the new wetwell to provide additional wetwell volume during peak wet weather flows. In addition, a level sensing conductivity probe was used for primary level measurement with float switches for redundant backup level sensing.

Contact

Hal Morris, P.E.
Project Manager