Client: City of Spartanburg
Status: Awarded: 2015 / Completed: 2015
Cost: $150,000

General Description

The Project consisted of removal of an existing 100 LF 72” corrugated metal pipe culvert and replacement with a 72” reinforced concrete pipe culvert, installation of new concrete headwalls, reconstructing existing catch basins, and road surface restoration.